This Lytton Park homeowner booked a free inspection expecting a straightforward insulation quote. The attic was at about 7 inches — roughly a third of today’s standard — but the more important find was on the underside of the roof.

1The Problem

Early mold staining on sheathing is easy to miss and cheap to fix — if you catch it before it spreads. Left alone, it turns a $2–3k top-up into a full removal and remediation project. This attic was right at that fork in the road.

The tape at inspection: roughly 7″ of settled insulation where the standard calls for 21.5″.
The tape at inspection: roughly 7″ of settled insulation where the standard calls for 21.5″.
The early-stage staining on the sheathing — caught while it was still a treatment job, not a removal job.
The early-stage staining on the sheathing — caught while it was still a treatment job, not a removal job.

2What the Inspection Found

The inspection documented settled insulation across all 1,650 sq ft, early mold staining on sections of the roof sheathing, and the usual Toronto suspects: unsealed ceiling penetrations feeding warm, moist house air into a cold attic. That moisture is exactly what mold feeds on — so sealing the ceiling was as important as treating the wood.

The before overview: thin, uneven coverage across a big attic footprint.
The before overview: thin, uneven coverage across a big attic footprint.

3How We Fixed It

Because it was caught early, the fix stayed a one-visit job:

  • Treated the affected sheathing with our mold protocol — cleaning, restoration, and a protective sealant against regrowth
  • Air-sealed the ceiling penetrations feeding moisture into the attic
  • Protected the soffit intakes with baffles to keep drying airflow moving
  • Blew fresh fiberglass over the existing material up to R-60
The same sheathing after treatment — cleaned and sealed.
The same sheathing after treatment — cleaned and sealed.
The finished attic: full, even coverage burying the joists.
The finished attic: full, even coverage burying the joists.
The after tape: fresh fiberglass past the R-60 line.
The after tape: fresh fiberglass past the R-60 line.

4The Result

One visit instead of a phased removal project — because the staining was caught at the treatable stage. The moisture path is sealed, the wood is protected, and the attic finally matches the R-60 standard. Covered by our 10-year workmanship warranty.

1,650 sq ftAttic size
7″ → R-60Insulation
1 dayOn site
10 yearsWarranty

5The Short Version

A Lytton Park homeowner in Toronto expected a straightforward insulation quote — the 1,650 sq ft attic measured about 7 inches, a third of today’s standard. The more important find was on the underside of the roof: early-stage moisture staining that was still at the treatable stage. Instead of a phased removal project, Confirmed Attics & Insulation handled it in one visit — treating and sealing the affected sheathing, closing the moisture path that fed it, and topping the attic up from 7 inches to R-60. Catching staining before it becomes established mold is the difference between a same-day fix and a full removal-and-rebuild, and it’s exactly what a free photographed inspection is designed to do. One visit instead of a phased removal project: one day on site, completed July 2026, covered by a 10-year workmanship warranty.

Wondering what’s going on in your attic?

Every problem on this page was found during a free, no-obligation inspection. We photograph everything, walk you through it, and give you a straight answer — even if that answer is “your attic is fine.”

Book My Free Inspection

Bulk Orders Quote

Submit Your Request and we'll get back to you ASAP.