Markham — MillikenAttic InspectionMold TreatmentVentilation

Markham (Milliken): the inspection that found mold hiding above a 1980s attic

Completed June 2026 · Real project, identified by area only to protect our customer’s privacy. Every photo is from this job. · Serving Markham

Milliken is one of Markham’s original growth waves — 1970s and 80s housing stock that has now been settling for four decades. This homeowner called for an insulation quote; the inspection camera came back with more than a depth reading.

1The Problem

The attic held about 7 inches of aged material — but the bigger issue was overhead. Sections of the soffit intake were blocked, meaning the attic couldn’t breathe, and stagnant moist air had started leaving its signature on the sheathing: the early stages of mold.

The depth reading: about 7″ of decades-old material.
The depth reading: about 7″ of decades-old material.
The staining forming on the sheathing — the reason ventilation work came first.
The staining forming on the sheathing — the reason ventilation work came first.

2What the Inspection Found

Blocked soffits are the quiet killer of Markham attics this age: insulation gets pushed into the eaves over the years, airflow dies, and moisture that should vent away instead condenses on cold wood. The inspection photographed the blockages bay by bay so the homeowner could see exactly why the mold was forming — and why just adding insulation would have made it worse.

One of the blocked soffit bays — no intake air means no drying.
One of the blocked soffit bays — no intake air means no drying.
The full before picture: aged coverage, dead airflow, staining beginning overhead.
The full before picture: aged coverage, dead airflow, staining beginning overhead.

3How We Fixed It

The job was sequenced so the cause was fixed before the symptom:

  • Treated the affected sheathing with our mold protocol and protective sealant
  • Cleared and baffled the soffit bays to restore intake airflow
  • Air-sealed the ceiling penetrations below
  • Topped the attic up to the R-60 standard with fresh blown fiberglass
The finished attic: fresh fiberglass burying the joists to R-60.
The finished attic: fresh fiberglass burying the joists to R-60.
The after tape: roughly 23″ of fresh coverage — past the R-60 line.
The after tape: roughly 23″ of fresh coverage — past the R-60 line.
At the eaves: cleared bays, protected airflow, coverage to the edge.
At the eaves: cleared bays, protected airflow, coverage to the edge.

4The Result

The airflow is back, the staining is treated and sealed against regrowth, and the insulation finally matches the standard. Caught at the inspection stage — not after a winter of ice dams made it obvious. 10-year workmanship warranty.

1,200 sq ftAttic size
7″ → R-60Insulation
4Soffit bays cleared
10 yearsWarranty

Wondering what’s going on in your attic?

Every problem on this page was found during a free, no-obligation inspection. We photograph everything, walk you through it, and give you a straight answer — even if that answer is “your attic is fine.”

Book My Free Inspection

Bulk Orders Quote

Submit Your Request and we'll get back to you ASAP.